Core Electrical

Search
Close this search box.
Donegal

Ballyshannon Hospital

The 80 bed unit accommodates both residents/patients of the Sheil Hospital and Rock Nursing Unit. It consists of 66 single bedrooms and 7 twin bedrooms in a combination of long stay, short stay and dementia wards.

CORE supplied Gripple Fast Trak to the entire project and worked alongside O’Hara Harrison from design to hand over.

Please see below a link to our project case study.

Client
H.S.E.

Main Contractor
Boyle Construction

Architects
Rhatigan Architects

Electrical Contractor
O’Hara Harrison Ltd.

Electrical Wholesaler
CEF Letterkenny

Project Value
€19m

Products
Gripple Fast Trak

Eircode
F94 DR40

Other Projects